1. Abd K.K. Intelligent scheduling of robotic flexible assembly cells. Springer Theses. Cham, Springer, 2015. DOI: 10.1007/978-3-319-26296-3
2. Levner E., Vishnevsky V. Recent advances in scheduling theory and applications in robotics and communications. In: Vishnevskiy V.M., Samouylov K.E., Kozyrev D.V. (eds). Distributed Computer and Communication Networks. DCCN 2021. Lecture Notes in Computer Science, vol. 13144. Cham, Springer, 2021, pp. 14-23. DOI: 10.1007/978-3-030-92507-9_2
3. Pinedo M.L. Planning and scheduling in manufacturing and services. New York, NY, Springer, 2005. DOI: 10.1007/978-1-4419-0910-7
4. Laajili E., Lamrous S., Manier M.-A., et al. An Adapted Variable Neighborhood Search based algorithm for the cyclic multi-hoist design and scheduling problem. Comput. Indust. Eng., 2021, vol. 157, art. 107225. DOI: 10.1016/j.cie.2021.107225
5. Gultekin H., Coban B., Akhlaghi V.E. Cyclic scheduling of parts and robot moves in m-machine robotic cells. Comput. Oper. Res., 2018, vol. 90, pp. 161-172. DOI: 10.1016/j.cor.2017.09.018
6. Clossen R.J., Malstrom E.M. Effective capacity planning for automated factories requires workable simulation tools and responsive shop floor control. Industrial Engineering, 1982, vol. 15, pp. 73-79.
7. Garcia-Mata C.L., Marquez-Gutierrez P.R., Burtseva L. Rescheduling in industrial environments: emerging technologies and forthcoming trends. IJCOPI, 2015, vol. 6, no. 3, pp. 34-48.
8. Pinedo M.L. Scheduling: theory, algorithms, and systems. Cham, Springer, 2022. DOI: 10.1007/978-3-031-05921-6
9. Manier M.-A., Bloch C.A. Classification for hoist scheduling problems. Int. J. Flex. Manuf. Syst., 2003, vol. 15, no. 1, pp. 37-55. DOI: 10.1023/A:1023952906934 EDN: EQOHCT
10. Perez-Rodriguez R. Simulation optimization for the multihoist scheduling problem. Appl. Comput. Intell. Soft Comput., 2021, vol. 2021, no. 1. DOI: 10.1155/2021/6639769
11. Bagchi T.P., Gupta J.N.D., Sriskandarajah C. A review of TSP based approaches for flowshop scheduling. Eur. J. Oper. Res., 2006, vol. 169, iss. 3, pp. 816-854. DOI: 10.1016/j.ejor.2004.06.040 EDN: XQFSTD
12. Lamothe, J., Correge M., Delmas J. Hoist scheduling problem in a real time context. In: 11th International Conference on Analysis and Optimization of Systems Discrete Event Systems. Lecture Notes in Control and Information Sciences, vol. 199. Berlin, Heidelberg, Springer, 1994, pp. 586-592. DOI: 10.1007/BFb0033591
13. Lamothe, J., Correge M., Delmas J. Hoist scheduling problem in a real time context. In: 11th International Conference on Analysis and Optimization of Systems Discrete Event Systems. Lecture Notes in Control and Information Sciences, vol. 199. Berlin, Heidelberg, Springer, 1994, pp. 586-592. DOI: 10.1007/BFb0033591
14. Ramin D., Fraizzoli D., Ballarino A., et al. Dynamic hoist scheduling for multi-recipe and multi-stage production lines: a logical framework. SSRN, 2022. DOI: 10.2139/ssrn.4105670 EDN: KYJGER
15. Levner E., Kats V., Levit V.E. An improved algorithm for cyclic flowshop scheduling in a robotic cell. Eur. J. Oper. Res., 1997, vol. 97, iss. 3, pp. 500-508. DOI: 10.1016/S0377-2217(96)00272-X EDN: AIYDIL
16. Kats V., Levner E. Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev’s vision and lasting contributions. J. Sched., 2012, vol. 15, no. 4, pp. 419-425. DOI: 10.1007/s10951-010-0221-x EDN: RRDDCR
17. Танаев B.C. К задаче составления расписания работы поточной линии с одним оператором. Инженерно-физический журнал, 1964, № 3, с. 111-114.
18. Карзанов А.В., Лифшиц Э.М. О минимальном числе операторов для обслуживания однородного линейного технологического процесса. Автоматика и телемеханика, 1978, № 3, с. 162-169.
19. Лившиц Э.М., Михайлецкий З.Н. Об оптимальном многооператорном циклическом процессе обслуживания поточной линии. Управляющие системы и машины, 1980, № 3, с. 187-190.
20. Kats V., Levner E. Cyclic scheduling in a robotic production line. J. Sched., 2002, vol. 5, no. 1, pp. 23-41. DOI: 10.1002/jos.92
21. Leung J.M.Y., Zhang G., Yang X., et al. Optimal cyclic multi-hoist scheduling: a mixed integer programming approach. Oper. Res., 2004, vol. 52, no. 6, pp. 965-976. /. DOI: 10.1287/opre.1040.0144
22. Levner E., Meyzin L., Ptuskin A. Periodic scheduling of a transporting robot under incomplete input data: a fuzzy approach. Fuzzy Sets Syst., 1998, vol. 98, iss. 3, pp. 255-266. DOI: 10.1016/S0165-0114(96)00387-9 EDN: LFAIOV
23. Ptuskin A.S. No-wait periodic scheduling of non-identical parts in flexible manufacturing lines with fuzzy processing times. Int. Workshop on Intelligent Scheduling of Robots and Flexible Manufacturing Systems. Center for Technological Education Holon, 1995, pp. 210-222. EDN: ZDVLAJ
24. Ptuskin A., Levner E., Kats V. Cyclic multi-hoist scheduling with fuzzy processing times in flexible manufacturing lines. Appl. Soft Comput., 2024, vol. 165, art. 112014. DOI: 10.1016/j.asoc.2024.112014 EDN: OHPAVU
25. Клейнер Г.Б. Экономико-математическое моделирование и экономическая теория. Экономика и математические методы, 2001, т. 37, № 3, с. 111-126. EDN: VUPJQD